What your engineer buys out, priced by companies whose licences were read first.

The chief engineer keeps the base building running and calls out the work he cannot do himself. Roof units, the switchgear, a panel that has to come down over a weekend. Whoever answers that call is holding a licence, a certificate and a policy, and somebody has to have looked at all three before the truck arrives.

VendoRFP reads them once and keeps the dates, so the engineer recommends a company and the manager signs without a second folder to open.

The credential each trade carries

On top of the two insurance documents every company files, each of these trades is gated on one credential of its own.

  • HVACEPA 608 certification
  • ElectricalElectrical contractor license
  • Both tradesFiled by every companyGeneral liability · Workers’ compensation

Two trades

Mechanical and electrical are gated separately.

A company verified for one of them is not thereby verified for the other, because the two credentials are issued by different bodies and prove different things. A request names its trade, and only companies cleared for that trade can answer it.

HVAC

EPA 608 certification

The federal certification required to handle refrigerants under EPA Section 608. It carries no expiration date.

Electrical

Electrical contractor license

The state license to perform electrical work as a company, with the date it expires.

A plumber, an elevator company and a fire-alarm contractor sit outside the trades a company can be verified in here. Their invoices are recorded and paid under the building they served, so the engineer’s year of spend reads in one place even where the contract came from somewhere else.

Dates

One of these credentials expires. The other never does.

Most of what a compliance file holds is a date, and a file is mostly the work of watching dates go past. These two rows are the exceptions at either end, and knowing which is which is the difference between a call you can place tonight and a company that cannot answer you at all.

Carries no date

EPA 608 certification

There is no expiration to watch, so the certification is filed once and stays good. What the platform holds is the certification itself rather than a countdown against it.

Carries a date

Electrical contractor license

The licence is watched to the day it runs to, and it is allowed no renewal window at all. A company whose licence has run out stops being able to answer requests for this trade until the state has issued the next one.

The file

Your limits sit above the licence, not beside it.

A licence says the state let this company do the work. A certificate says who pays if the work goes wrong, and that figure is yours to set. Both are read, and the second one is checked against a number you typed.

The coverage lines, and the column that is yours

The requirements editor holds 8 coverage lines, in the words a published request prints them in. You set a figure per trade, so mechanical work can carry a heavier number than the rest of the building without dragging every other trade up with it.

CoverageYour minimum
General liability (per occurrence)
General liability (aggregate)
Workers' comp / employer's liability
Auto liability
Umbrella / excess
Professional liability
Pollution liability
Crime / employee dishonesty

You set the coverage limits you require, often the number your own insurer or lender asks for. A vendor whose recorded coverage falls below one of them cannot propose on your work until it is raised.

A late certificate has 30 days to reach the file. A policy whose own date has passed does not get that window — it stops the company from answering your requests the day it expires. How a certificate is verified

The request

Write the scope your engineer would describe.

The address, the trade, what the work is, and a date for answers. An engineer’s description of a job is usually better than a form’s, so the request takes it in the words it was written in and prints your minimums underneath.

Printed on the face of every request

Issued through VendoRFP. Vendors send their proposals back on this site. No phone number or email address is published with this RFP.

Answers arrive priced line by line with the attendance each company is offering. Whoever you award was already carrying the licence and the cover, since holding both was the condition of writing to you.

After the award

Every visit lands under the building it happened at.

A service call at eleven at night is logged the same way a quarterly attendance is, with the photographs taken while the panel was open. The certificate stays in the same file with its date, and the invoice arrives with its own number and its own standing.

What the accountant is handed

Choose a period and download it. Each of these files is written by the platform, so none of them depends on an account with anybody else.

  • Detailed CSV.csv
  • General journal CSV (double-entry).csv
  • QuickBooks Online CSV.csv
  • QuickBooks Desktop IIF.iif
  • Xero CSV.csv

Building engineering

Send one mechanical scope out and see who can legally answer it.

Create an account, set the limits your insurance article states, and publish the scope your engineer wrote. VendoRFP reads the licence and the certificate behind every answer.

An engineer already knows which company he wants on the roof. What takes the week is proving that the company is licensed, insured to your article, and current on both.

Industries we serve

Janitorial and day porterThe insurance exhibitHow a request works